
Quintuple variable head penetration apparatus
简要描述: 1. Installation method and steps:1. Check according to the packing list and confirm that the accessories are complete.2. Install the hanging plate of the five-unit permeation device with a glass tube (note during installation: place the end with the valve down), and the installation height is
产品介绍
1. Installation method and steps:
1. Check according to the packing list and confirm that the accessories are complete.
2. Install the hanging plate of the five-unit permeation device with a glass tube (note during installation: place the end with the valve down), and the installation height is h≥50cm (see the installation diagram of the variable head permeation device).
3. Install the hook in the attachment at the appropriate position above the top of the hanging plate with an electric drill and expansion bolt, and hang the water bottle on the hook.
4. Use the hose to connect according to the installation diagram of the five-unit variable water head infiltration device, and 5 variable water head infiltration meters can be connected at the same time. (The hose connection length of the overflow hole and the exhaust hole can be determined according to the user's needs).
2. Configuration list
serial number | name | quantity | Remark |
1 | water bottle | 1 | |
2 | Hook and expansion bolt | 1 set | Install the water bottle to use |
3 | Pentaple osmosis device hanging plate with glass tubes | 1 set | |
4 | hanging board hook | 2 pay | Mounting the penta-permeation device hanging plate with glass tubes |